Skip to content
Hydrapanel
Commercial kitchen fit-out with Hydrapanel-lined walls and ceiling

Commercial & trade

Hotels, commercial kitchens, high-use spaces. Built to take it.

Plenty of lightweight panel products are chasing the bathroom renovation market. High-use commercial spaces demand more: a solid, fire-rated, impact-resistant lining that keeps performing under daily punishment — and keeps wet trades off your programme.

Durability where it counts

A solid core, not a hollow profile.

Hydrapanel is a magnesium-oxide fireproof board faced in high-pressure laminate — a solid, rigid sheet that resists water, steam, abrasion and the cleaning chemicals commercial spaces throw at it daily.

It's independently fire tested, certified for NZ Building Code compliance, and backed by a 15-year warranty against delamination, rotting and cracking. That's the standard high-use spaces should be specifying to.

Core
Solid MgO fireproof board
Face
High-pressure laminate (HPL)
Fire
Panel 2-S fire rated (BRANZ) · MgO core A1 (SGS)
Warranty
15 years
Blowtorch fire test against a Hydrapanel sheet — the panel face resists the flame

No wet trades. Time is money.

Take the tilers, plasterers and painters off the programme.

Hydrapanel installs with construction adhesive, direct to framing or over existing linings — no tile adhesive, no grouting, no plastering, no multi-coat painting, and no waiting between trades.

A typical bathroom can be lined in hours rather than the days a tile-and-plaster system takes. Panels cut with standard woodworking tools — no silica dust on site — and after the 24-hour adhesive cure, the wall is finished and ready to use.

Days saved on site, fewer trades to sequence, reduced labour cost, faster project timelines — and a lower total installed cost in many cases.

Hydrapanel tile panels

1–2 days

walls lined and finished

  • Installed by the builder, direct to framing or existing linings
  • Construction adhesive — no cement, no grout
  • 24-hour adhesive cure, then done — no grouting or drying days
  • No painting, plastering or additional finishing

Ceramic / porcelain tiling

3–5 days

plus separate trades

  • Requires substrate prep and waterproofing membrane
  • Tile adhesive, layout and cutting — slow on large formats
  • Grouting plus curing time before use
  • Separate wet trades to book, sequence and wait on

Typical install-time comparison for a bathroom wall lining. Ask us or your Bunnings Trade rep for pricing on your job.

Off-site Truss House interior lined with Hydrawall decor panels

Off-site & volume construction

Proven in off-site builds.

Hydrapanel systems line Clever Living Truss House builds — walls and ceilings finished in the factory-friendly, transportable way off-site construction demands. An ideal small-home option, and a model for repeatable commercial fit-outs: hotel bathrooms, washroom pods, kitchen and service areas.

Where it's working now

High-use spaces, lined and in service.

Commercial kitchens, restaurants, public and industrial washrooms, healthcare and laboratory spaces, schools and daycares, retail fit-outs, and hotel service areas.

Commercial kitchen fit-out with Hydrapanel walls and ceiling — hygienic, fire rated, wipe-clean
Working restaurant kitchen with Hydrapanel walls
Public washroom with Hydratile-lined walls and cubicles — high-use durability
Accessible washroom lined in large-format Hydratile panels
Laboratory/healthcare space with impervious Hydrapanel lined walls and ceilings
Supermarket fit-out with Hydrapanel-lined service areas
High-traffic commercial interior lined with Hydrapanel
Commercial interior showcasing pre-finished Hydrapanel wall linings
School bathroom featuring Hydratile herringbone custom design panels
Boutique hospitality washroom with Hydrapanel gloss panels and anodised trims
Commercial facility corridor lined with impervious panel walls and ceiling tiles cut to size from panels
Commercial Kitchen - subway tile panels on all walls

Fitting out a hotel, kitchen or washroom?

Talk to us about volumes, lead times and spec — or grab every certificate and test report from the spec hub.